Year: 2011
Owner
City and County of San Francisco Public Utilities Commission
Design
URS Corporation
Prime Contractor
Shimmick Construction
Project Description
50 million construction of a new treated water reservoir and systems related to the addition of 40 MGD treatment capacity to the existing facility.
Scope of Work
Project Manager for AVAR Construction responsible for the installation of soil nail wall for future reservoir expansion.
Year: 2016
Owner
Lennar
Design
LPAS
Project Description
Description: 750-acre project expanding from the Bayview Hunters Point to Candlestick Park will have approximately 12,000 homes, 300 acres of public space,500,000 square feet of retail, and over 3 million square feet of research and development.
Scope of Work
Operations Manager for Azul Works in charge of overseeing multiple project in The San Francisco Shipyard development. Azul provided demolition, earthwork, and underground utility installation services on multiple projects in this development. My responsibility was to ensure our project management team and field crews had the resources they needed to meet the client’s schedule.
Year: 2015
Owner
Terramar Retail Centers
Design
BSAA
Prime Contractor
Swinerton
Project Description
$300 million development on 15 acre site with 185,000 square-feet of demolition and 330,000 square feet of new retail and commercial space.
Scope of Work
Remove asphalt and concrete, grade site, off-haul soil, place aggregate base, and pave. Value engineering support to minimize cost impact of contaminated soil. Remove asphalt and concrete, grade site, off-haul soil, place aggregate base, and pave. Value engineering support to minimize cost impact of contaminated soil
Year: 2014
Owner
Woods Partners
Design
Architect: BAR Architects Shoring:
SPI Consulting
Engineers Civil: Sherwood Engineers
Prime Contractor
Build Group
Project Description
$100 million construction of entire city block in downtown San Francisco. New development includes 5 new buildings for 330 residential units, 2 underground parking garages, office, and retails space.
Scope of Work
Project Manager for A&B Construction responsible for demolition of existing buildings, mass excavation including disposal of hazardous materials, shoring and structural excavation.
Year: 2013
Owner
Vanke Group and Tishman Speyer Joint Venture
Design
Architect - Arquitectonica, Civil:
Arup, Structural: Magnusson Klemencic
Associates
Scope of Work
Project Manager for A&B Construction responsible for excavating five-level below-ground garage.
Year: 2012
Owner
AGI Capital and Avant Housing
Design Shoring by SPI Consulting
Prime Contractor
Webcor Builders
Project Description
$36 million dollar, eight story LEED Gold residential building in downtown San Francisco with 280 units and four level underground garage
Scope of Work
Project Manager for AVAR Construction responsible for the design and installation soldier beam and lagging wall with four rows of tiebacks
Year: 2011
Owner
City and County of San Francisco Public Utilities Commission
Design
URS Corporation
Prime Contractor
Shimmick Construction
Project Description
$50 million construction of a new treated water reservoir and systems related to the addition of 40 MGD treatment capacity to the existing facility.
Scope of Work
Project Manager for AVAR Construction responsible for the
installation of soil nail wall for future reservoir expansion.
Year: 2010
Owner
University of California Berkeley
Design
Micropile Design by
Rutherford & Chekene
Prime
Contractor
Hunter Construction
Project Description
$50 million new construction of Law Building. The micro-pile work was completed in the adjacent building because the foundation required additional support
Scope of Work
Project Manager for AVAR Construction responsible for the installation of soil nail wall for future reservoir expansion.
Year: 2009
Owner
University of California Berkeley
Design
AECOM
Prime
Contractor
Hunter Construction
Project Description
$150 million building to be constructed in front of UC Berkeley Memorial Stadium. The excavation was over 50 feet deep in some areas and ran along the edge of the stadium. Soldier beams and tiebacks had to be installed to prevent undermining the stadium and construction had to be completed in a manner that would allow the football games to continue.
Scope of Work
Project Manager for AVAR Construction responsible for the design and construction of soldier beam and tieback wall that would support the Memorial Stadium while new building was being constructed.
Year: 2008
Owner
Port of Oakland
Design
Port of Oakland
Prime
Contractor
Pavex Construction
Project Description
$25 million awarded to Pavex Construction. Project required paving 72 hours per day to ensure runway continues to stay open .
Scope of Work
Project Engineer for Pavex Construction in charge of tracking costs and quantities for all aspects of project including demolition, grading, paving, concrete, and utilities.
Year: 2007
Owner
Alameda County Public
Works Agency
Design
City of Hayward
Prime
Contractor
Pavex Construction
Project Description
$1.6 million channel rehabilitation requiring disposal of contaminated materials and placing vegetated soil lists to prevent additional erosion.
Scope of Work
Project Engineer/Project Manager for Pavex Construction responsible for negotiating subcontracts and tracking costs. Prepare short and long term schedule for the project.
Year: 2006
Owner
San Francisco International
Airport Taxiway
Design
San Francisco International Airport
Prime
Contractor
Pavex Construction
Project Description
$70 million taxiway addition to accommodate more airline traffic.
Scope of Work
Project Engineer for Pavex Construction in charge of tracking quantities and costs associate with the off-haul of over 10,000 loads of material and placement of 50,000 tons of asphalt.